diff options
author | Joel Challis <[email protected]> | 2025-02-27 22:14:32 +0000 |
---|---|---|
committer | GitHub <[email protected]> | 2025-02-28 09:14:32 +1100 |
commit | c4aaab5fa34ec9d66bb57c3640a5356c2daa638f (patch) | |
tree | 21fa0c16d64a0c38a64e0c14668b48858ba384da /docs/breaking_changes.md | |
parent | 1efc82403bebe759272d1ba7a79d9dfa0d5df506 (diff) | |
download | qmk_firmware-c4aaab5fa34ec9d66bb57c3640a5356c2daa638f.tar.gz qmk_firmware-c4aaab5fa34ec9d66bb57c3640a5356c2daa638f.zip |
2025q1 develop changelog (#24949)
Co-authored-by: Nick Brassel <[email protected]>
Diffstat (limited to 'docs/breaking_changes.md')
-rw-r--r-- | docs/breaking_changes.md | 20 |
1 files changed, 10 insertions, 10 deletions
diff --git a/docs/breaking_changes.md b/docs/breaking_changes.md index 132c5943cc..a5a57ccd12 100644 --- a/docs/breaking_changes.md +++ b/docs/breaking_changes.md @@ -10,25 +10,25 @@ Practically, this means QMK merges the `develop` branch into the `master` branch ## What has been included in past Breaking Changes? +* [2025 Feb 23](ChangeLog/20250223) * [2024 Nov 24](ChangeLog/20241124) * [2024 Aug 25](ChangeLog/20240825) -* [2024 May 26](ChangeLog/20240526) * [Older Breaking Changes](breaking_changes_history) ## When is the next Breaking Change? -The next Breaking Change is scheduled for February 23, 2025. +The next Breaking Change is scheduled for May 25, 2025. ### Important Dates -* 2024 Nov 24 - `develop` is tagged with a new release version. Each push to `master` is subsequently merged to `develop` by GitHub actions. -* 2025 Jan 26 - `develop` closed to new PRs. -* 2025 Jan 26 - Call for testers. -* 2025 Feb 9 - Last day for merges -- after this point `develop` is locked for testing and accepts only bugfixes -* 2025 Feb 16 - `develop` is locked, only critical bugfix PRs merged. -* 2024 Nov 21 - `master` is locked, no PRs merged. -* 2025 Feb 23 - Merge `develop` to `master`. -* 2025 Feb 23 - `master` is unlocked. PRs can be merged again. +* 2025 Feb 23 - `develop` is tagged with a new release version. Each push to `master` is subsequently merged to `develop` by GitHub actions. +* 2025 Apr 27 - `develop` closed to new PRs. +* 2025 Apr 27 - Call for testers. +* 2025 May 11 - Last day for merges -- after this point `develop` is locked for testing and accepts only bugfixes +* 2025 May 18 - `develop` is locked, only critical bugfix PRs merged. +* 2025 May 23 - `master` is locked, no PRs merged. +* 2025 May 25 - Merge `develop` to `master`. +* 2025 May 25 - `master` is unlocked. PRs can be merged again. ## What changes will be included? |